1.
Tiara CC, Soekarno S. A Financial Feasibility Study of The Train Loading System 3 (TLS 3) Capacity Upgrade Project at PT XYZ. EKOMA [Internet]. 2026 Jul. 31 [cited 2026 Aug. 12];5(5):8889-95. Available from: https://al-haramjournal.co.id/EKOMA/article/view/20345