Cost Estimation Planning Model For Implementation Of Irrigation Network Improvement Projects In East Java Province, Indonesia

Main Article Content

Soepriyono

Abstract

This study generally examines, and in-depth analyses the estimated model of the planned budget plan for the Irrigation Network Improvement Project at the Public Works and Housing Department in the East Java Province, Indonesia. The research data is secondary data in the form of Recapitulation of Budget Plans (RAB) for Irrigation Works in six Cities / Regencies, such as Surabaya, Lamongan, Tuban, Pasuruan, Sidoarjo and Mojokerto, until 2013 to 2018. To equalize the homogeneity of the data, thus RAB data for each City / Regency is converted based on the HSPK of Surabaya and the project budget value is projected in 2019 based on the prevailing inflation in East Java Province. Data analysis use the Cost Significant Model method then the project budget planning. The results of the study concluded that the regression model for estimating effective, efficient and accurate project cost budget plans to be applied to the Irrigation Network Improvement Project in the Public Works and Housing Department in East Java Province is a regression equation Y = 112,545+ 11,595 X4+ 8,493 X5 + 9,247 X6. Which X4, X5 dan X6 represent landfill work, masonry work and cement mixing work per meter length of channel. Comparison of the accuracy of the estimated project cost budget plan model with the actual HPS cost estimation model obtained an upper limit of 4.20% and a minimum lower limit = - 11.500% with an average comparison of - 2.45% which is stated as excellent accuracy.

Downloads

Download data is not yet available.

Article Details

How to Cite
Soepriyono. (2022). Cost Estimation Planning Model For Implementation Of Irrigation Network Improvement Projects In East Java Province, Indonesia . ULIL ALBAB : Jurnal Ilmiah Multidisiplin, 1(8), 2755–2763. Retrieved from https://al-haramjournal.co.id/JIM/article/view/633
Section
Articles

References

Akhsa, E. 2015. Estimasi biaya pekerjaan rehabilitasi dan peningkatan jaringan irigasi menggunakan “cost significant model”(studi kasus: dinas pengairan kabupaten aceh tenggara). ETD Unsyiah.

Amin, M. (2017). Development of Cost Estimation Model for Residential Building. InternationalJournal of Civil and Structural Engineering Research, 5(1), 1-4.

An, S.H., Kim G.H., & Kang K.I. (2007). A Case-Based Reasoning Cost Estimating Model Using Experience by Analytic Hierarchy Process. Building & Environment, 42: 2573-2579.

Aptiyasa, P.A.A. 2016. Cost Model Konseptual Untuk Bangunan Gedung Rumah Sakit (Doctoral dissertation, Tesis Magister Teknik Sipil (S-2), Program Pasca SarjanaUniversitas Atmajaya Yogyakarta).

Azmi, A.F., & Huda, M. (2017). The Application on Cost Significant Model on The Estimated Cost of Resedential Project in Surabaya and its Surrounding. In Proceedings of The 2017 International Conference on Technology and Applications. Surabaya, Indonesia.

Challal, A.,& Tkiouat, M. 2012. The design of cost estimating model of construction project: Application and simulation. Open Journal of Accounting, 1(1), 15-26.

Fragkakis, N. I., Marinelli, M., & Lambropoulos, S. (2013). Preliminary cost estimate model for culverts. Journal of Procedia Engineering, 123(2013), 153-16.

Handayani, F.S., Sugiyarto, S.,& Panuwun, R.T. 2015. Komponen biaya yang mempengaruhi estimasi biaya peningkatan jalan provinsi. Matriks Teknik Sipil, 3(3).

Hyari, K.H., Al-Daraiseh, A.,& El-Mashaleh, M. 2016. Conceptual cost estimation model for engineering services in public construction projects. Journal of Management in Engineering, 32(1), 04015021.

Kesavan, R., Elanchezhian, C., & Ramnath, B. 2008. Process Planning and Cost Estimation. New Age International Publishers, New Delhi.

Kim, G.H., Seo, D.S., & Kang K.I. (2005). Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates. Journal of Computer & Civil Engineering, 19(20), 208-211.

Kim, G.H., An, S.H.,& Kang, K.I. 2004. Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning. Building and environment, 39(10), 1235-1242.

Kim, K.J., &Kim, K. 2010. Preliminary cost estimation model using case-based reasoning and genetic algorithms. Journal of Computing in Civil Engineering, 24(6), 499-505.

Kim, M., Lee, S., &Woo, S. 2012. Approximate cost estimating model for river facility construction based on case-based reasoning with genetic algorithms. KSCE Journal of Civil Engineering, 16(3), 283-292.

Lee, J.Y., Lee, S., &Woo, S., 2011. Framework of the approximate cost estimating model for river dredging construction. KSCE Journal of Civil Engineering, 15(1), 33-42.

Mahamid, I. 2011. Early cost estimating for road construction projects using multiple regression techniques. Construction Economics and Building, 11(4), 87-101.

Mohamed, B., Mouloud, B., & Mourad, M. 2012. Project Management Using Cost Significant Items and Neural Network. In Proceedings of the 2012 International Conference on Industrial Engineering and Operations Management(pp. 3-6). Istanbul, Turkey .

V Montes, M., M Falcón, R., & Ramírez-de-Arellano, A. 2014. Estimating building construction costs by production processes. The Open Construction and Building Technology Journal, 8(1).

Huda, M. 2018. Cost Estimate Modelling of Prestressed Concrete Bridge at the Public Works and Housing Department of Bina Marga East Java Province Indonesia. International Journal of Engineering and Technology, 9(6), 4543-4550.

Similar Articles

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 > >> 

You may also start an advanced similarity search for this article.